an abstract photo of a curved building with a blue sky in the background

One licensed builder.
Start to finish.
No handoffs.

General & Specialist Medical Practice Fit-outs across Australia - design, approval and build, managed personally by a licensed builder with 12+ years in medical fit-outs.

Licensed
Nationally

25+ years Building,
12+ years Dental

110+ Premium
Fit-outs

5-Year Workmanship
Warranty

Built for the rooms that matter

Every room in a medical fit-out has its own build requirements - here's what we plan for:

Consult and treatment rooms

Layouts planned around patient flow and clinical workflow, data and power points positioned for equipment, joinery built for day-to-day use.

Imaging & radiology

Full Lead-shielded rooms sized to your equipment's requirement, radiation compliance reporting, dedicated circuits and switching.

Day surgery / procedure suite

Built to the standard your procedures require, coordinated with the relevant state health authority sign-off where applicable.

Plant & mechanical

Services planned around equipment loads, with capacity for future rooms or additional imaging.

Staff and storage

Lockers, scrub areas, patient refresh, server room, plus full-height storage.

Reception and waiting

Patient flow, data and comms points, feature joinery, signage power.

Meet Luke and the OBLink team

  • 25+ years in building

  • 12+ years in dental & medical fit-outs

  • 8 years directing 500-600 projects nationally.

You deal with Luke Passaro - licensed builder and Director - from your first inspection to opening day. But it's not a one-man show: Luke leads a hand-selected national team that works with him consistently from job to job, not a rotating crew hired fresh for each site.

Where a project needs specialist skills outside that core team, Luke draws on trusted local talent in that state to fill the gap - so you get the same standard of work whether you're in Sydney, Brisbane, or regional NSW, without ever being handed off to a sales team or a subcontractor Luke hasn't vetted himself.

Free on-site assessment. Itemised quote. One builder, start to finish

Explore our recent projects

Whether it’s a new space or renovating on a fourth floor, we’ve completed hundreds of projects across Australia. Explore some of our recent projects below.

Highlands Specialist Hub
Physician Services, Bowral, New South Wales

Potentialz Unlimited
Clinical Psychology, Bella Vista, New South Wales

Macarthur Cardiology
Specialist Suite, Campbelltown, New South Wales

Caring Paws
Veterinary Care, Vermont South, Victoria

Our process

From first inspection to opening day - one process, managed end to end in as little as 3 months.

Free on-site assessment

Luke inspects the space in person: access and delivery logistics, condition of walls, floors and ceilings, existing mechanical and wet/dry/fire services, floor levelness, and any strata or building management rules that could affect the build.

Design & itemised quote (2-3 weeks)

A design laid out against your brief, with a quote broken down by discipline so you can see exactly what's included. Nothing bundled, nothing hidden.

Permits & Approval included

CDC or DA, managed in-house from submission to sign-off. Typically 6–8 weeks; a change-of-use DA adds 3–6 months, and you'll know upfront if that applies to you.

Construction & Build (~8 weeks)

Around 8 weeks for a standard fit-out once approved, with the same crew from start to finish. Extensive renovation work adds roughly 2–4 weeks on top.

Handover

Opening-day ready, backed by a 5-year workmanship warranty. Luke stays your point of contact after handover too, for anything that comes up down the track.

Free on-site assessment. Itemised quote. One builder, start to finish

Case Study

The Kurmond Dentist - full transformation from a run-down cafe site to modern dental experience.

The brief:

A former cafe site converted into a full dental practice - but rather than start clinical and strip the hospitality identity out, the client wanted a hybrid experience: a working dental surgery with an in-house cafe retained for patients and staff. Full renovation, inside and out.

The problem:

Zero dental infrastructure existed. Every service a dental fit-out needs - chair plumbing, BPA-protected electrical circuits, X-ray power and switching, sterilisation drainage - had to be designed and built from a raw cafe shell, not adapted from something already there. On top of that, the storefront itself needed external work to read as a dental practice while keeping a cafe counter live within the same footprint, which meant two very different service loads (hospitality plumbing/exhaust vs. clinical services) coexisting in one build.

The solve:

A full renovation covering both the shell and the facade — new services run from scratch for the surgeries and steri room, alongside the retained cafe function, with the two zones planned so neither compromises the other's compliance requirements (health/food-service separation, drainage, ventilation).

The outcome:

A working dental practice with a genuinely different front-of-house experience - patients and staff get an in-house cafe, not just a waiting room, inside a site that had no clinical bones to begin with six months earlier.

What our clients say

Real feedback from practices we've built for.

Luke was an absolute standout in building practices. He managed the entire process seamlessly, working closely with our designers to perfect the layout and functionality while delivering prompt communication every step of the way. The builds were completed to the highest quality, on strict timelines and within budget. We couldn't recommend OBLink Projects highly enough.

Dr. Seth Mousa,
The Pitt Town Dentist & The Kurmond Dentist, NSW

Over a three-year partnership managing a $2M project portfolio, the OBLINK team and Luke proved to be exceptional collaborators.

OBLink Project's commitment to clear communication and timeline clarity ensured seamless execution, consistently resulting in deliverables that exceeded expectations.

I'm writing this testimonial approximately a year after Luke and the team at OBLink Projects finished my fitout. So I can speak to the build quality of the product received which is excellent.

In an industry known for charlatans, Luke is honest, easy going and acts with integrity.

Dr. Irshad Ali,
Ramsay Healthcare, NSW

Dr. Mun Jong,
Focus Orthodontics, NSW

Speak with our friendly team

At OBLink Projects, we are committed to creating the perfect space for your needs.

We pride ourselves on our ability to listen, understand and exceed your expectations, and will work tirelessly to ensure that your project is delivered to the highest standards of quality and workmanship.

Make an enquiry today or call us here to book a site inspection or discuss your next big project.

Licensed
Nationally

110+ Premium Fit-outs

25+ years Building,
12+ years Dental

5-Year Workmanship
Warranty